CONTROL AND INSTRUMENTATION SUBSYSTEM MODERNIZATION OF THE EAGLE TEST BENCH
https://doi.org/10.52676/1729-7885-2022-1-22-27
Abstract
From the beginning of 2021 to the present, “Institute of Atomic Energy” branch of the RSE “National Nuclear Center of the Republic of Kazakhstan” has been working on modernization of the control and instrumentation subsystem of the information and control system of the EAGLE test bench. As part of this work, the purchased equipment was mounted, the primary adjustment of the modules and expansion baskets was made using the specialized Modbus Utility software included in the delivery set.
About the Authors
S. A. IlinykhKazakhstan
Ilinykh Stanislav A.
Kurchatov
A. V. Sysaletin
Kazakhstan
Sysaletin Andrey V.
Kurchatov
V. A. Ermakov
Kazakhstan
Ermakov Vladimir A.
Kurchatov
A. B. Kudranova
Kazakhstan
Kudranova Adiya B.
Kurchatov
R. Zh. Nauryzbaev
Kazakhstan
Nauryzbaev Rakhat Zh.
Kurchatov
R. S. Islamov
Kazakhstan
Islamov Ramil S.
Kurchatov
References
1. Il'inykh S.A., Sysaletin A.V., Ermakov V.A., Kudranova A.B., Nauryzbaev R.Zh., Modernizatsiya informatsionnoupravlyayushchey sistemy eksperimental'nogo stenda «EAGLE» // Vestnik NYaTs RK. – 2019. – No. 4. – P. 38–44.
2. GOST 27.002-2015 Nadezhnost' v tekhnike.
3. WinPAC-8000 User Manual (For Standard WP-8000) Version 2.0.9. – 2014 ICP DAS Co., Ltd.
4. GOST 11064-5-2015 Ergonomic design of control centers. Displays and controls.
Supplementary files
Review
For citations:
Ilinykh S.A., Sysaletin A.V., Ermakov V.A., Kudranova A.B., Nauryzbaev R.Zh., Islamov R.S. CONTROL AND INSTRUMENTATION SUBSYSTEM MODERNIZATION OF THE EAGLE TEST BENCH. NNC RK Bulletin. 2022;(1):22-27. (In Russ.) https://doi.org/10.52676/1729-7885-2022-1-22-27